Te
Team management radarAI team management and OKR risk management platform · V54
Connecting to the live product service
AI team management and OKR risk management platform

Turn stress, KR deviations and neglected items into traceable management signals

Help managers generate stress warnings, KR deviation reasons and project watch lists based on auditable evidence, reducing guesswork and supporting more transparent management reviews.

  1. 01
    Determine the scope of management dataInput team, management cycle, data source description and privacy boundaries, and make it clear that the system only analyzes data provided by users.
  2. 02
    Generate management risk signalsRun Stress Radar, KR Deviation Explanation and Project Watch List separately to produce auditable records.
  3. 03
    Manual confirmation and correctionManagers review evidence references and confirm, reject, or revise stress warnings, deviation reasons, and observations.
  4. 04
    Cycle review reportSummarize unconfirmed warnings, deviations from KR and observation items to form an on-site management audit report.
Pressure warning to be confirmedNo pressure warning to be confirmed yetCount the number of records in pressure_assessment where alert_level is not empty and review_status=to be manually confirmed.
Number of reasons for deviation from KRNo reason for deviation from KR yetCount the number of records in the current management cycle in kr_deviation_reason.
Number of observation itemsNo observation items yetCount the number of records in project_watch_item in the current management cycle and whose next_review_date has not expired.
Data source statusNo data source configuredAccording to the data_source_note and the uploaded file parsing results, the results show: not configured, uploaded for verification, parsable, parsing failed.
BUSINESS INPUT

New project

Each workspace represents a team or organizational unit that requires OKRs, pressure, and project oversight.

Loading product-specific business fields.

Not saved
TRACEABLE OUTPUT

Team Management Radar Report

Results, sources, failures, approvals, and rollbacks are saved by project.

0 live runs

No business results yet

No resolvable work events have been uploaded to generate a stress assessment.

PRIVACY

Data use boundary

This product may handle sensitive management data such as member codes, roles, work event times, OKR/KR progress, project leaders, and stress warnings. It is recommended to use member codes, limit the scope of visibility, and obtain necessary notification or consent within the organization. Pressure-related records are only displayed to authorized managers by default, and access and modification audits are retained. Current 10 Role Review Supplement: Expanded scope of sensitive fields: Member List, Member/Responsible ID, OKR Background, Data Source Description, Project Rules, Progress Notes, Tags, Update Time, Work Event Time, Evidence References, Stress Assessment, KR Deviation Reasons, Project Observations and Person-related excerpts in audit reports are treated as sensitive data. ;Uploaded files must define minimum required columns, optional columns, and prohibited content; processing of medical diagnoses, psychological counseling records, compensation, protected categories, full text of private chats, disciplinary materials, and irrelevant personally identifiable information is prohibited. ; Export uses member codes or desensitized information by default; exporting personal stress details requires additional permissions and confirmation. ; Sensitive record viewing, export, approval, rejection, correction, deletion and rollback all need to be written in the audit. ; After deleting business details, non-essential details that can reconstruct personal pressure judgments should not be retained; necessary security audits should be retained but not deleted silently by rollback.

RETENTION

Data retention

By default, site analysis records are retained for 180 days according to the management cycle; administrators can delete project data, upload files, and generate reports in advance. After deletion, only necessary security audit logs will be retained, and detailed data that can reconstruct personal stress judgments will not be retained.

SAFETY

Human responsibility and rollback

What this product generates is a team management risk reminder, not a medical, mental health, legal, personnel disciplinary or performance evaluation conclusion. Stress values ​​only represent workload or abnormal period signals in user-provided data and need to be manually confirmed by personnel with administrative rights based on member wishes, context, and organizational policies.

Rollback only means undoing the analysis records, report paragraphs, confirmation status or workflow stages generated in this site, and restoring to the previous site version; since this product is not connected to external production systems, rollback will not and cannot undo any external project, communication, calendar, personnel or production system changes.